NEW FEATURES IN PROJECT COMMANDER 6.6 VERSION
Click on the Project Commander logo below to start the download of a 1 page summary in Word of the upgraded features. It will commence is a few seconds.
Click on the Project Commander logo below to start the download of a fully detailed 24 page report in Word of the upgraded features. It will commence is a few seconds.
If you wish to save the Word file right click on the logo and SAVE TARGET AS.
It has several important improvements. …
Graph Actual Days Achieved (using % complete) against Total Current Duration and Total Baseline Duration.
The number of task bar colours to be rolled up to the summary levels are increased from 2 to 5.
- Summary Bar display options
Show rolled up colours or summary bar at different levels.
Automatically link bars (& calculate lags) without moving bars.
Options to shade project calendar with a different colour shading for other than holidays/weekends.
Actual % used to mark up Baseline bar at task & summary levels.
Similar to PowerProject, you link from a mid bar to the start/end of any linked bar. A file with normal Project Commander links can be converted to look like PowerProject.
- Draw lines on alternate rows
Draw horizontal lines after every 2 rows (not one).
Link any Project Commander cell to any Excel cell for updating on file opening.
Free form text Notepad for materials.
A table for materials ordered and delivered.
Random selection for printing of Comments & Material Notes.
Columns with values (such as costs, units, durations) can be attached to a formula column.
An updated graphics engine to improve graphics handling.
If you assign an alert on a task, a white arrow marker is set on the alert date.
- Excel update for use with PDA
How to export part of project to an Excel spreadsheet to transfer to a PDA and copy back to update a project for progress.
|